Georgetown Water reports that on Wednesday, Aug. 27, a gate valve patch repair will take place at 244 Andover St. The repair is scheduled from 7 a.m. to 11 a.m.

Andover Street will be closed off for one-way traffic only during repairs, and police will be on-site conducting traffic. Residents and community members are asked to plan their travel accordingly, obey posted signage, or avoid the area during this time.

Georgetown Water thanks residents for their patience and understanding.

Gate Valve Patch Repair Scheduled for Wednesday, Aug. 27 at Andover Street
REMINDER: Winterize Outdoor Hose Bibs, Faucets and Irrigation Systems!Click Here for Helpful Tips